All questions

Operating Engineers Certification Program (OECP) Practice Exam

Browse all practice questions for the Operating Engineers Certification Program (OECP) Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Operating Engineers Certification Program (OECP) Practice Exam course image
All questions

These questions are part of the practice quiz. Start practicing

  • Name the four basic configurations of wire ropes.
  • Choosing the correct sling configurations helps to prevent which risks during lifting?
  • Power lines are always presumed what?
  • If the horizontal sling angle decreases, what happens to the rated capacity?
  • ASME stands for which organization?
  • How many people signal the cranes on a two-crane lift?
  • Which rating is specified for the crane extinguisher?
  • What is the construction rigging standard?
  • What is the approximate weight of concrete per cubic foot?
  • A boom angle indicator does not show what?
  • What type of fire extinguisher is required on a crane?
  • Which standard number covers general industry rigging?
  • An asterisk on a load chart indicates which of the following?
  • Maximum wind speed for lifting personnel recommended by ANSI?
  • Which types of sling require tags?
  • Which description best matches the role of a spotter during lifts?
  • What is the primary purpose of a pre-operation inspection for heavy equipment?
  • Forces shall not be greater than what on hand levers?
  • Which statement best describes the function of a load chart for hydraulic excavators?
  • Which ANSI standard covers land cranes on barges?
  • In lifting operations, reducing the sling angle requires reevaluating the load because the rated capacity does what?
  • Which parameter is typically not indicated by LMIs?
  • Man basket doors must swing which way?
  • What should you do when a warning alarm sounds during operation?
  • What is the correct approach to maintenance energy control on a machine?
  • Which statement best describes the maximum opening of sling eyes in this context?
  • How does wind affect crane operations and what should you do?
  • Which description best defines the function of an interlock or safety switch on equipment?
  • What is the minimum distance between splices on braided slings?
  • Maintaining proper load height and distance from personnel helps reduce which hazards?
  • What is the sling stress formula?
  • Travel distance on 2 way levers shall not exceed what?
  • How many ANSI/ASME audible signals are listed?
  • Why are the edges of a man basket smooth?
  • If an LMI fails, what is the proper procedure?
  • What is the minimum distance from a 200 kV power line?
  • Never ballast an open hull barge with what?
  • The safe use of slings largely depends on four important factors. Which set is correct?
  • A crane traveling at 15 mph must be able to stop in what distance?
  • Which organization publishes the B30.5 standard for construction cranes?
  • What is the recommended fleet angle for a grooved drum?
  • Rotation-resistant rope wear pattern is primarily which of the following?
  • What is the minimum number of wraps on a drum?
  • The wedge and socket must be?
  • What is the purpose of a locked-out clearance procedure?
  • What does LMI stand for?
  • What must voice signals include?
  • What is the weight of a 2 ft by 2 ft by 2 ft block of concrete?
  • What is the risk of operating with a damaged or missing safety guard?
  • What should you do if you notice a worn or damaged pin while preparing to lift a load?
  • A boom angle indicator does not display which parameter?
  • All directions must be given in the operator's what?
  • Which of the following is NOT one of the four factors that determine safe sling use?
  • What does RCL stand for in crane safety?
  • Which term describes the front-to-back tilt of a vessel?
  • What should you do if there is a hydraulic spill on the job site?
  • Lang lay rope wires lay in which direction relative to the strands?
  • What do asterisks signify on a load chart?
  • Which diagram on a crane load chart shows the crane's range of operation without accounting for boom deflection?
  • What is the correct sequence for maintenance energy control on a machine?
  • What is a best practice for cooling system maintenance?
  • If the LMI fails, which data should you consult?
  • Which term describes the sideways tilt of a vessel?
  • Hand signals must use what method?
  • Shift and monthly inspections are performed by a?
  • What is the purpose of a daily lubrication checklist?
  • What is the purpose of the machine's emergency stop?
  • What should an operator do in the event of a power line contact?
  • What does EIPS stand for?
  • A deduction should be made for an extension even when lifting from it?
  • The sum of all angles in a rigging triangle is how many degrees?
  • Which of the following is NOT essential when performing ground disturbance near utilities?
  • On a multiple-crane lift, each crane should be loaded to no more than what percentage of its rated capacity?
  • What action should never be performed during a wire rope inspection?
  • When performing ground disturbance near utilities, which steps are essential?
  • What should be included in a post-operation inspection?
  • What does IWRC stand for?
  • How should you respond to a burst hydraulic hose?
  • In a two-crane lift, what is the required number of signalers?
  • Kick-out system disables which combination of controls?
  • If an alarm code is displayed during operation, where should you refer to for the proper procedure?
  • What recommended length should wire rope be seized to?
  • Freeboard describes the distance between the waterline and what part of the barge?
  • Which combination of fluids is typically checked during a pre-operation inspection?
  • Which functions are disabled by a kick-out system?
  • What is the general industry crane standard?
  • During a walk-around, you notice a cracked mirror and a frayed handrail. What should you do?
  • What action should be taken if wind conditions exceed manufacturer limits or site policy during crane operations?
  • A basket hitch's capacity rating indicates it can handle what multiple of its working load?
  • What is the term for the point at which the load balances, often represented in diagrams?
  • How should vibrations and noise be managed on a construction site?
  • Why should safety devices not be modified or bypassed on equipment?
  • What does ANSI stand for?
  • What is the general industry rigging standard?
  • Which statement about the emergency stop is true?
  • In rigging terminology, what does PS stand for?
  • What is the recommended fleet angle for a smooth drum?
  • In the sling stress formula, what operation is performed after multiplying the Load Factor by the weight?
  • When ground stability is uncertain, what is the recommended action?
  • Where should electrocution warnings be displayed on the crane?
  • When should worn or damaged pins, bolts, or attachments be replaced or repaired?
  • IPS stands for which term?
  • What actions should be taken after completing a lift with a crane?
  • PCSA stands for which organization?
  • The shaded area on a load chart indicates which category?
  • What should a signal person verify before giving any direction to the operator?
  • The use of equipment to hoist personnel is generally prohibited, with which exception?
  • An annual inspection must be performed by a
  • How do you measure wire rope?
  • The safety factor for a chain sling is?
  • In rigging, what does 'rated capacity' refer to and why is it critical?
  • Which tag detail is included on alloy steel chain slings but not on welded chain slings?
  • Is a rigger required for Assembly/Disassembly operations?
  • What is the construction crane standard?
  • Which action provides the best protection when parking on a slope or uneven surface?
  • The maximum list allowed for a land crane on a barge is?
  • Which standard number covers construction rigging?
  • The end of a cable protruding from a socket should be?
  • What is the purpose of travel alarms or audible warnings on equipment?
  • Rotation resistant wire rope tends to wear from which part?
  • What is the minimum distance ANSI and PCSA allow for a drum flange to extend above the top layer of rope?
  • Why is ground condition assessment important before operating heavy equipment?
  • What is the safety factor for synthetic slings?
  • The movement of a barge from side to side is called?
  • What should you do if a machine becomes stuck in mud or soft ground?
  • Compacted strand ropes usually have which properties?
  • What is the ANSI/ASME standard for construction crane?
  • For wire rope installation from reel to drum, which alignment is correct?
  • Power lines are always presumed to be what in crane safety guidelines?
  • Which part of the load charts does not show boom deflection?
  • An operator must obey a stop signal from who?
  • What are the safety factors for regular running ropes and for boom erection?
  • When lifting from an extension, should you deduct from the load chart?
  • How many basic configurations of wire ropes are there?
  • Which statement about the daily lubrication checklist is true?
  • Which device provides information about the crane's load moment?
  • How should fuels be stored on a job site to minimize risk?
  • When using radio, telephone or electronic signals, the receiving must be what?
  • Dynamic movement of a barge can make lifts be what?
  • Which tag detail is included on welded alloy steel chain slings?
  • How do you determine the load's center of gravity (CG)?
  • What must be on the tag for welded alloy steel chain slings?
  • What is a common cause of operator fatigue and how can it be mitigated?
  • What should you do to contain a hydraulic spill and follow site procedures?
  • Why is it important to use appropriate fluids in cold weather?
  • When a hydraulic hose bursts, what should you do regarding PPE and distance?
  • What is the D/d ratio of load Houston drums and sheaves?
  • Which concept is used to identify where the load balances in a lifting system?
  • A vertical angle should never exceed what degrees?
  • What minimum clearance should be kept from a power line of unknown voltage?
  • What term describes the distance between the waterline and the deck of a barge?
  • In the event of power line contact, what action regarding movement is recommended?
  • Which items are essential PPE for operator safety during operation on most OECP sites?
  • Forces shall not be greater than what on a foot pedal?
  • What is the recommended practice when traveling on slopes with loaders or bulldozers?
  • What is the safety factor for rotation resistant rope?
  • What factor primarily causes lifts on a barge to be unpredictable?
  • Land cranes on a barge fall under what ANSI standard?
  • Which items are listed as checks during a wire rope inspection?
  • A horizontal angle of what should never be less than?
  • Which statement best describes the fleet angle range for a smooth drum?
  • When parking a machine on uneven ground, which steps should you take?
  • Why is a tag-out tag used in a non-emergency situation?
  • In the sling stress formula, the Load Factor is multiplied by the load's weight and divided by the number of legs. Which expression represents this relationship?
  • Which action is explicitly required after completing a crane lift?
  • If a lifting device rated at 40 tons is tested at 125% of its rating, what is the test load in tons?
  • What is the minimum safe clearance distance from a 200 kV line?
  • If signals are interrupted, the operator must do what?
  • Which fluids should you check during a pre-operation inspection?
  • In a multi-crane lift, each crane should be loaded to no more than what percentage of its rated capacity?
  • What is the correct refueling procedure to prevent fire hazards?
  • What is the purpose of setting outriggers on a crane?
  • What is the capacity rating of a basket hitch?
  • Which option lists all four basic configurations of wire ropes?
  • Which practice helps safely start a diesel engine in cold weather?
  • What is the minimum distance between splices, sleeves, or end fittings on wire rope slings?
  • What is the capacity rating for a choker hitch?
  • An LMI can be used to weigh a load up to what percentage of capacity at the working radius?
  • What is the minimum distance to a power line of unknown voltage?
  • Which action best reduces exposure to vibrations and noise on a worksite?
  • Why is face-to-face communication important on noisy sites?
  • How should weather conditions influence operating plans?
  • On a load chart, the shaded area denotes which of the following?
  • What is the weight of the object being lifted called?
  • If a lift would exceed the crane's load chart limits, what should you do?
  • All lifting devices are load tested to what percentage of their rated capacity?
  • Movement front to back on a barge is?
  • Why is keeping walkways clear of debris important?
  • What is the purpose of lockout/tagout?
  • Which of the following are the ANSI/ASME audible signals?
  • Which statement about rigging safety factors is correct?
  • What is the correct method for transporting heavy loads on public roads?
  • What is the main hazard when working near overhead power lines?
  • What are the three types of wire rope cores?
  • What does RCL stand for?
  • What is considered the perfect sling angle?
  • What is the safety factor for all other types of rigging?
  • Where must electrocution warnings be displayed on a crane?
  • What must be on the tag for alloy steel chain slings?
  • What should you do if you encounter an underground utility line while digging?
  • When should you check the LMI, anti-two-block, and all crane functions?
  • During a post-operation inspection, which items should be checked?
  • What is the term for the maximum safe load a machine can carry at a given outreach or radius?
  • What is a spotter and when is one required?
  • What is the weight of a 3 ft by 3 ft by 3 ft block of concrete?
  • 1926.1400 is also known as which subpart?
  • Which methods determine if the ground is firm enough to support equipment?
  • How do you install wire rope from a reel to a drum?
  • The primary reason to identify safety defects during pre-operation is to prevent what?
  • CFR stands for?
  • Which organization is associated with the wind speed guideline for lifting personnel?
  • Which feature is essential for on-site fuel containers?
  • Which way do the wires lay in a lang lay rope?
  • What does 'tag out' mean during equipment maintenance?
  • Which measurement expresses the minimum splice distance for braided slings?
  • What is an interlock or safety switch on equipment?
  • Most LMIs will not indicate which parameter?
  • What is the correct approach to travel on slopes with equipment when a load is involved?
  • Which organization publishes the B30.5 standard for construction cranes?
  • What is the proper action if you discover a hydraulic fluid leak during inspection?
  • Why is using the correct sling and hook configurations important?
  • Sling eyes (loops) should not be opened more than what?
  • When lifting a load with a crane, which actions are essential to ensure stability?
  • Which two organizations are referenced in relation to drum flange clearance above rope?
  • How should you determine the load's center of gravity (CG)?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy